Construction ERP software for builders in Salem

Track labour, material and money across every Salem site — from the muster in the morning to the client payment at the end of the stage.

சேலத்துல ஒவ்வொரு site-ஓட labour, material, பணம் — காலையில muster-ல இருந்து stage payment வரைக்கும் எல்லாம் ஒரே இடத்துல.

The Sites screen: every live project with its stage, progress, health and deadline

Building in Salem

Salem combines residential construction with steel, engineering and institutional work, and many contractors here run both private houses and industrial or commercial contracts at the same time. That mix makes a single view of labour and material across quite different job types more useful than a tool designed for one of them.

Approvals: Projects here go through DTCP and Salem City Municipal Corporation.

Residential and commercial in one system

Project types are configurable, each with its own contract model, rate driver and payment-stage template, so a house and a commercial shed are priced and billed the way each should be without needing two systems.

Labour across job types

The same muster covers crews on any kind of site, and the loaded day cost — base, overtime, holiday rate, allowances — is computed by one engine, so cost comparison across job types is meaningful.

Equipment and bulk material

Bulk materials bought by the load and plant hired by the day are recorded against the site, so the costs that usually disappear into "miscellaneous" land on the project that incurred them.

Built for Tamil Nadu, not localised for it

Cent, ground and square feet

Cent, ground and square feet are supported as first-class area units alongside square metres, so land and built-up area are entered the way they are actually quoted here.

Maistry and kooli wages

Maistry and kooli day wages are costed through the muster — base, overtime, holiday rate and allowances — and attributed to the right site, including when one worker splits a day between two projects.

Tamil on the documents

Quotation PDFs render Tamil correctly, so specifications and terms can be written in the language the client reads.

Questions from Salem builders

Can I run residential and commercial projects in the same account?

Yes. Project types, contract models and payment-stage templates are configurable per type, so each kind of work is priced and billed appropriately while labour, material and finance stay in one place.

Is there a limit on how many sites I can run?

Site limits depend on your plan. Talk to us about how many projects you run concurrently and we will tell you plainly which plan fits.

Can I compare labour cost between a house and an industrial job?

Yes, because both are costed through the same muster and the same loaded day rate — base, overtime, holiday rate and allowances. Two job types computed the same way are comparable in a way that two separate registers never are.

Plant and equipment hire gets lost in our accounts. Where does it go?

Against the site that used it. Equipment hire is one of the standard site expense categories, so machine-by-the-day and tipper-by-the-load land on the project that incurred them instead of in a company-level miscellaneous line.

Start with

Also serving